AERAVIC1 – FELLOWS 115 kV (ckt 1)

Transmission line · 115 kVInternal gridDAM
CAISO ID: 39070_AERAVIC1_115_34778_FELLOWS _115_BR_1 _1

Current shadow price

Loading live market data…

Observed congestion

Peak shadow price
$21.80
on 2026-09-10 at 00:00 UTC
Binding intervals
1
recorded in retained history
Tracked since
2026-09-10
1 day of observation

About this constraint

AERAVIC1 – FELLOWS 115 kV (ckt 1) is a transmission line operating at 115 kVthat appears as a congestion constraint in the California ISO market. When power flow reaches this element's operating limit, CAISO's market optimization assigns it a shadow price — the cost to the system of that limit binding — which in turn drives locational price separation around it.

Across the market intervals retained in this dataset, it has bound 1 time, with the largest shadow price observed at $21.80/MWh on 2026-09-10. Prices are shown with the sign CAISO publishes; magnitude is the severity signal.

Data comes from CAISO OASIS (PRC_NOMOGRAM) for both the day-ahead and real-time markets, refreshed automatically. This page is informational only and is not trading, financial, or operational advice.

Related internal constraints

OMS_21156170_SCE_PSPS_EXP
peak $9446.51 · 6 binding
17700_DIB_RGD
peak $1601.98 · 5 binding
VICTOR – ROADWAY 115 kV (ckt 1)
peak $72.45 · 43 binding
COLWATER – DUNNSIDE 115 kV (ckt 1)
peak $9236.67 · 9 binding
INYOKN nomogram
peak $972.90 · 294 binding
IVANPAH – MTN PASS 115 kV (ckt 1)
peak $1129.67 · 9 binding
← Back to the CAISO Congestion Monitor