GARDNER – MARICOPW 70.0 kV (ckt 1)

Transmission line · 70 kVInternal gridDAM
CAISO ID: 34864_GARDNER _70.0_34867_MARICOPW_70.0_BR_1 _1

Current shadow price

Loading live market data…

Observed congestion

Peak shadow price
$190.58
on 2026-08-31 at 00:30 UTC
Binding intervals
133
recorded in retained history
Tracked since
2026-08-28
7 days of observation

About this constraint

GARDNER – MARICOPW 70.0 kV (ckt 1) is a transmission line operating at 70 kVthat appears as a congestion constraint in the California ISO market. When power flow reaches this element's operating limit, CAISO's market optimization assigns it a shadow price — the cost to the system of that limit binding — which in turn drives locational price separation around it.

Across the market intervals retained in this dataset, it has bound 133 times, with the largest shadow price observed at $190.58/MWh on 2026-08-31. Prices are shown with the sign CAISO publishes; magnitude is the severity signal.

Data comes from CAISO OASIS (PRC_NOMOGRAM) for both the day-ahead and real-time markets, refreshed automatically. This page is informational only and is not trading, financial, or operational advice.

Related internal constraints

INYOKN nomogram
peak $1544.32 · 466 binding
LOS BANS 70.0/230 kV transformer (bank 3)
peak $31.62 · 1 binding
BORDEN 70.0/230 kV transformer (bank 1)
peak $10.92 · 1 binding
BORDEN – CASSIDY 70.0 kV (ckt 1)
peak $189.26 · 14 binding
MCSWAINJ – MRCDFLLS 70.0 kV (ckt 1)
peak $474.50 · 42 binding
MCSWAINJ – EXCHEQUR 70.0 kV (ckt 1)
peak $81.22 · 2 binding