MIDWAY – VINCENT 500 kV (ckt 2)

Transmission line · 500 kVInternal gridDAM
CAISO ID: 30060_MIDWAY _500_24156_VINCENT _500_BR_2 _3

Current shadow price

Loading live market data…

Observed congestion

Peak shadow price
$1400.81
on 2026-07-25 at 02:30 UTC
Binding intervals
254
recorded in retained history
Tracked since
2026-07-23
6 days of observation

About this constraint

MIDWAY – VINCENT 500 kV (ckt 2) is a transmission line operating at 500 kVthat appears as a congestion constraint in the California ISO market. When power flow reaches this element's operating limit, CAISO's market optimization assigns it a shadow price — the cost to the system of that limit binding — which in turn drives locational price separation around it.

Across the market intervals retained in this dataset, it has bound 254 times, with the largest shadow price observed at $1400.81/MWh on 2026-07-25. Prices are shown with the sign CAISO publishes; magnitude is the severity signal.

Data comes from CAISO OASIS (PRC_NOMOGRAM) for both the day-ahead and real-time markets, refreshed automatically. This page is informational only and is not trading, financial, or operational advice.

Related internal constraints

7690-COOLWATER_KRAMER_IM_NG
peak $1478.96 · 97 binding
INYOKN nomogram
peak $1250.73 · 204 binding
22020- 23497 AVOCDO-FALBRK_69_BR_1_1
peak $962.65 · 4 binding
MIGUEL 500/1.0 kV transformer (bank 80)
peak $128.35 · 23 binding
MESA CAL 500/13.8 kV transformer (bank 4H)
peak $73.01 · 4 binding
ANTELOPE – WIRLWIND 500 kV (ckt 1)
peak $128.91 · 217 binding
← Back to the CAISO Congestion Monitor