MOE-ELD – ELDORDO 500 kV (ckt 1)

Transmission line · 500 kVInternal gridDAM
CAISO ID: 99002_MOE-ELD _500_24042_ELDORDO _500_BR_1 _2

Current shadow price

Loading live market data…

Observed congestion

Peak shadow price
$74.34
on 2026-11-02 at 15:00 UTC
Binding intervals
2
recorded in retained history
Tracked since
2026-10-12
21 days of observation

About this constraint

MOE-ELD – ELDORDO 500 kV (ckt 1) is a transmission line operating at 500 kVthat appears as a congestion constraint in the California ISO market. When power flow reaches this element's operating limit, CAISO's market optimization assigns it a shadow price — the cost to the system of that limit binding — which in turn drives locational price separation around it.

Across the market intervals retained in this dataset, it has bound 2 times, with the largest shadow price observed at $74.34/MWh on 2026-11-02. Prices are shown with the sign CAISO publishes; magnitude is the severity signal.

Data comes from CAISO OASIS (PRC_NOMOGRAM) for both the day-ahead and real-time markets, refreshed automatically. This page is informational only and is not trading, financial, or operational advice.

Related internal constraints

OMS_21156170_SCE_PSPS_EXP
peak $9446.51 · 6 binding
INYOKN nomogram
peak $972.90 · 294 binding
17700_DIB_RGD
peak $1601.98 · 5 binding
HDWSH – N.GILA 500 kV (ckt 1)
peak $19.81 · 6 binding
MIGUEL 500/1.0 kV transformer (bank 80)
peak $357.90 · 5 binding
VINCENT 500/230 kV transformer (bank 2)
peak $241.88 · 10 binding
← Back to the CAISO Congestion Monitor