PSEMCKIT – BELRDG J 115 kV (ckt 1)

Transmission line · 115 kVInternal gridDAM
CAISO ID: 35061_PSEMCKIT_115_34225_BELRDG J_115_BR_1 _1

Current shadow price

Loading live market data…

Observed congestion

Peak shadow price
$16.05
on 2026-08-04 at 01:00 UTC
Binding intervals
5
recorded in retained history
Tracked since
2026-07-24
12 days of observation

About this constraint

PSEMCKIT – BELRDG J 115 kV (ckt 1) is a transmission line operating at 115 kVthat appears as a congestion constraint in the California ISO market. When power flow reaches this element's operating limit, CAISO's market optimization assigns it a shadow price — the cost to the system of that limit binding — which in turn drives locational price separation around it.

Across the market intervals retained in this dataset, it has bound 5 times, with the largest shadow price observed at $16.05/MWh on 2026-08-04. Prices are shown with the sign CAISO publishes; magnitude is the severity signal.

Data comes from CAISO OASIS (PRC_NOMOGRAM) for both the day-ahead and real-time markets, refreshed automatically. This page is informational only and is not trading, financial, or operational advice.

Related internal constraints

115kv ML
peak $2074.64 · 14 binding
VICTOR – ROADWAY 115 kV (ckt 1)
peak $63.07 · 7 binding
UKIAH – CITY UKH 115 kV (ckt 1)
peak $35.13 · 4 binding
HGHLNDJ2 – CORTINA 115 kV (ckt 1)
peak $51.21 · 43 binding
CARIBOU 115/1.0 kV transformer (bank 11)
peak $152.18 · 47 binding
RIO OSO – BRNSWKT1 115 kV (ckt 1)
peak $2.56 · 1 binding
← Back to the CAISO Congestion Monitor