SILVERGT – OLD TOWN 230 kV (ckt 1)

Transmission line · 230 kVInternal gridRTM
CAISO ID: 22430_SILVERGT_230_22596_OLD TOWN_230_BR_1 _1

Current shadow price

Loading live market data…

Observed congestion

Peak shadow price
$22.92
on 2026-10-01 at 18:45 UTC
Binding intervals
1
recorded in retained history
Tracked since
2026-10-01
1 day of observation

About this constraint

SILVERGT – OLD TOWN 230 kV (ckt 1) is a transmission line operating at 230 kVthat appears as a congestion constraint in the California ISO market. When power flow reaches this element's operating limit, CAISO's market optimization assigns it a shadow price — the cost to the system of that limit binding — which in turn drives locational price separation around it.

Across the market intervals retained in this dataset, it has bound 1 time, with the largest shadow price observed at $22.92/MWh on 2026-10-01. Prices are shown with the sign CAISO publishes; magnitude is the severity signal.

Data comes from CAISO OASIS (PRC_NOMOGRAM) for both the day-ahead and real-time markets, refreshed automatically. This page is informational only and is not trading, financial, or operational advice.

Related internal constraints

OMS_21156170_SCE_PSPS_EXP
peak $9446.51 · 6 binding
KASSONJ2 – TRACY 115 kV (ckt 1)
peak $583.13 · 23 binding
AEC_TP1 – TESLA 115 kV (ckt 1)
peak $1433.55 · 75 binding
AEC_TP2 – TESLA 115 kV (ckt 1)
peak $125.88 · 143 binding
CURTISS – FBERBORD 115 kV (ckt 1)
peak $0.08 · 1 binding
MELONES – MELNS JA 115 kV (ckt 1)
peak $187.51 · 11 binding