SMYRNA 2 – SEMITRPJ 115 kV (ckt 1)

Transmission line · 115 kVInternal gridDAM
CAISO ID: 34700_SMYRNA 2_115_34742_SEMITRPJ_115_BR_1 _1

Current shadow price

Loading live market data…

Observed congestion

Peak shadow price
$22.64
on 2026-10-26 at 18:00 UTC
Binding intervals
3
recorded in retained history
Tracked since
2026-08-15
74 days of observation

About this constraint

SMYRNA 2 – SEMITRPJ 115 kV (ckt 1) is a transmission line operating at 115 kVthat appears as a congestion constraint in the California ISO market. When power flow reaches this element's operating limit, CAISO's market optimization assigns it a shadow price — the cost to the system of that limit binding — which in turn drives locational price separation around it.

Across the market intervals retained in this dataset, it has bound 3 times, with the largest shadow price observed at $22.64/MWh on 2026-10-26. Prices are shown with the sign CAISO publishes; magnitude is the severity signal.

Data comes from CAISO OASIS (PRC_NOMOGRAM) for both the day-ahead and real-time markets, refreshed automatically. This page is informational only and is not trading, financial, or operational advice.

Related internal constraints

OMS_21156170_SCE_PSPS_EXP
peak $9446.51 · 6 binding
17700_DIB_RGD
peak $1601.98 · 5 binding
VICTOR – ROADWAY 115 kV (ckt 1)
peak $72.45 · 43 binding
COLWATER – DUNNSIDE 115 kV (ckt 1)
peak $9236.67 · 9 binding
IVANPAH – MTN PASS 115 kV (ckt 1)
peak $1129.67 · 9 binding
DOUBLTTP – FRIARS 138 kV (ckt 1)
peak $251.30 · 15 binding