SN JSE A – SNJOSEB 115 kV (ckt 1)

Transmission line · 115 kVInternal gridDAM
CAISO ID: 35618_SN JSE A_115_35616_SNJOSEB _115_BR_1 _1

Current shadow price

Loading live market data…

Observed congestion

Peak shadow price
$194.69
on 2026-08-03 at 22:00 UTC
Binding intervals
54
recorded in retained history
Tracked since
2026-07-21
22 days of observation

About this constraint

SN JSE A – SNJOSEB 115 kV (ckt 1) is a transmission line operating at 115 kVthat appears as a congestion constraint in the California ISO market. When power flow reaches this element's operating limit, CAISO's market optimization assigns it a shadow price — the cost to the system of that limit binding — which in turn drives locational price separation around it.

Across the market intervals retained in this dataset, it has bound 54 times, with the largest shadow price observed at $194.69/MWh on 2026-08-03. Prices are shown with the sign CAISO publishes; magnitude is the severity signal.

Data comes from CAISO OASIS (PRC_NOMOGRAM) for both the day-ahead and real-time markets, refreshed automatically. This page is informational only and is not trading, financial, or operational advice.

Related internal constraints

INYOKN nomogram
peak $1544.32 · 466 binding
115kv ML
peak $2074.64 · 14 binding
7690-COOLWATER_KRAMER_IM_NG
peak $1259.69 · 144 binding
SylmarBNK N-S Import nomogram
peak $1481.26 · 1 binding
VICTOR – ROADWAY 115 kV (ckt 1)
peak $63.07 · 7 binding
UKIAH – CITY UKH 115 kV (ckt 1)
peak $35.13 · 4 binding
← Back to the CAISO Congestion Monitor