DELAMO – BARRE 230 kV (ckt 1)

Transmission line · 230 kVInternal gridRTM
CAISO ID: 24029_DELAMO _230_24016_BARRE _230_BR_1 _1

Current shadow price

Loading live market data…

Observed congestion

Peak shadow price
$171.40
on 2026-10-21 at 20:30 UTC
Binding intervals
14
recorded in retained history
Tracked since
2026-10-21
8 days of observation

About this constraint

DELAMO – BARRE 230 kV (ckt 1) is a transmission line operating at 230 kVthat appears as a congestion constraint in the California ISO market. When power flow reaches this element's operating limit, CAISO's market optimization assigns it a shadow price — the cost to the system of that limit binding — which in turn drives locational price separation around it.

Across the market intervals retained in this dataset, it has bound 14 times, with the largest shadow price observed at $171.40/MWh on 2026-10-21. Prices are shown with the sign CAISO publishes; magnitude is the severity signal.

Data comes from CAISO OASIS (PRC_NOMOGRAM) for both the day-ahead and real-time markets, refreshed automatically. This page is informational only and is not trading, financial, or operational advice.

Related internal constraints

OMS_21156170_SCE_PSPS_EXP
peak $9446.51 · 6 binding
17700_DIB_RGD
peak $1601.98 · 5 binding
SILVERGT – OLD TOWN 230 kV (ckt 1)
peak $22.92 · 1 binding
CENTER S – MESA CAL 230 kV (ckt 1)
peak $67.13 · 2 binding
LITEHIPE – MESA CAL 230 kV (ckt 1)
peak $1457.71 · 4 binding
MAGUNDEN – ANTELOPE 230 kV (ckt 1)
peak $120.71 · 1 binding
← Back to the CAISO Congestion Monitor