VINCENT – S.CLARA 230 kV (ckt 1)

Transmission line · 230 kVInternal gridDAM
CAISO ID: 24155_VINCENT _230_24128_S.CLARA _230_BR_1 _1

Current shadow price

Loading live market data…

Observed congestion

Peak shadow price
$31.85
on 2026-11-07 at 23:00 UTC
Binding intervals
3
recorded in retained history
Tracked since
2026-11-07
1 day of observation

About this constraint

VINCENT – S.CLARA 230 kV (ckt 1) is a transmission line operating at 230 kVthat appears as a congestion constraint in the California ISO market. When power flow reaches this element's operating limit, CAISO's market optimization assigns it a shadow price — the cost to the system of that limit binding — which in turn drives locational price separation around it.

Across the market intervals retained in this dataset, it has bound 3 times, with the largest shadow price observed at $31.85/MWh on 2026-11-07. Prices are shown with the sign CAISO publishes; magnitude is the severity signal.

Data comes from CAISO OASIS (PRC_NOMOGRAM) for both the day-ahead and real-time markets, refreshed automatically. This page is informational only and is not trading, financial, or operational advice.

Related internal constraints

OMS_21156170_SCE_PSPS_EXP
peak $9446.51 · 6 binding
INYOKN nomogram
peak $972.90 · 294 binding
17700_DIB_RGD
peak $1601.98 · 5 binding
SILVERGT – OLD TOWN 230 kV (ckt 1)
peak $22.92 · 1 binding
CENTER S – MESA CAL 230 kV (ckt 1)
peak $67.13 · 2 binding
LITEHIPE – MESA CAL 230 kV (ckt 1)
peak $1457.71 · 4 binding