Most congested transmission constraints in CAISO

Congestion in the California ISO market shows up as a shadow price on a specific piece of equipment — a transmission line, a transformer, or an operating nomogram. This page ranks those constraints two ways: how often each one binds, and how hard it hits when it does. The two lists are not the same, and the difference is usually the interesting part.

146 constraints tracked · 8 day observation window · data through 2026-07-29

Binds most often — internal grid

Ranked by the number of market intervals in which each constraint was binding.
1EL CAJON – LOSCOCHS 69.0 kV (ckt 1)Line · 69 kV · peak $1069.71516
2USWP-WKR – SBTAP 60.0 kV (ckt 1)Line · 60 kV · peak $311.62472
3TAFT – Q356TAP 70.0 kV (ckt 1)Line · 70 kV · peak $108.17382
4LE GRAND – ADRA TAP 115 kV (ckt 1)Line · 115 kV · peak $450.11377
5HENRITTA 70.0/230 kV transformer (bank 4)Transformer · 70 kV · peak $66.05334
6SNJQJCT – GFFNJCT 70.0 kV (ckt 1)Line · 70 kV · peak $175.63328
7KETTLEMN – GATES 70.0 kV (ckt 1)Line · 70 kV · peak $193.61306
8HPLND JT – CLVRDLJT 60.0 kV (ckt 1)Line · 60 kV · peak $532.27301
9MIDWAY – VINCENT 500 kV (ckt 2)Line · 500 kV · peak $1400.81254
10ANTELOPE – WIRLWIND 500 kV (ckt 1)Line · 500 kV · peak $128.91217
11LOSBANOS – PADR FLT 230 kV (ckt 1)Line · 230 kV · peak $147.58208
12INYOKN nomogramNomogram · peak $-1250.73204
13KRAMER – VICTOR 230 kV (ckt 2)Line · 230 kV · peak $224.81202
14OMS_19695948_DEV_RDB_ALISNomogram · peak $-87.28185
15ATWELL – SMYRNA 1 115 kV (ckt 1)Line · 115 kV · peak $56.48162
Counts are binding intervals observed by Voltlas within the retained history window, across both day-ahead and real-time markets.

Highest shadow price reached — internal grid

Ranked by the largest shadow price observed, in dollars per megawatt-hour.
1MIDWAY – BELRDG J 115 kV (ckt 1)Line · 115 kV · 7 binding intervals$3910.24
27690-COOLWATER_KRAMER_IM_NGNomogram · 97 binding intervals$-1478.96
3AEC_TP1 – TESLA 115 kV (ckt 1)Line · 115 kV · 156 binding intervals$1448.40
4SC21ATP – ARVIN 70.0 kV (ckt 1)Line · 70 kV · 122 binding intervals$1434.65
5MIDWAY – VINCENT 500 kV (ckt 2)Line · 500 kV · 254 binding intervals$1400.81
6KINGSBRG – CONTADNA 115 kV (ckt 1)Line · 115 kV · 110 binding intervals$1307.33
7CRWCRKSS – CRWS LDS 60.0 kV (ckt 1)Line · 60 kV · 36 binding intervals$1274.28
8INYOKN nomogramNomogram · 204 binding intervals$-1250.73
9CORTINA 60.0/1.0 kV transformer (bank 1)Transformer · 60 kV · 7 binding intervals$1188.84
10SN JSE A – EL PATIO 115 kV (ckt 1)Line · 115 kV · 4 binding intervals$1155.63
11HENTAP1 – MUSTANGS 230 kV (ckt 1)Line · 230 kV · 6 binding intervals$1095.50
12EL CAJON – LOSCOCHS 69.0 kV (ckt 1)Line · 69 kV · 516 binding intervals$1069.71
13DTCH FL1 – CHCGO PK 115 kV (ckt 1)Line · 115 kV · 11 binding intervals$1018.03
1422020- 23497 AVOCDO-FALBRK_69_BR_1_1Nomogram · 4 binding intervals$962.65
15USWP-JRW – CAYETANO 230 kV (ckt 1)Line · 230 kV · 1 binding intervals$839.22
Values are shown with the sign CAISO publishes; ranking uses magnitude. A single severe hour can outrank a constraint that binds far more often.

Interties — binds most often

Scheduling constraints on the paths connecting CAISO to neighbouring grids.
1LDWP_IPP_NORTHIntertie · peak $-227.93467
2EPE_NET_ITCIntertie · peak $-1154.45384
3IPPUTAH_ITCIntertie · peak $-32.33330
4PATH_14Intertie · peak $1487.44159
5TEPC_BA_EXP_ITCIntertie · peak $-50.19118
6DOSMGO-PNOCHE_230_2_1Intertie · peak $528.40111
7IPPDCADLN_ITCIntertie · peak $-12.6882
8PACE_FOURCORNE345_ITCIntertie · peak $-41.4974
9TOTAL_WYOMING_EXPORTIntertie · peak $44.4858
10NOB_ITCIntertie · peak $-28.2754
Intertie and internal counts are not directly comparable — the two feeds retain different history windows.

How to read these rankings

Frequency and severity measure different risks. A constraint that binds in most hours at a few dollars per megawatt-hour is a chronic, predictable feature of the network — it shapes where power is worth producing, but rarely surprises anyone. A constraint that binds twice a month at $3910 per megawatt-hour is the opposite: mostly invisible, then briefly dominant. Traders, schedulers, and planners tend to care about different ends of that spectrum.

Voltage is a useful second signal. Lower-voltage elements — 60, 69, 70, and 115 kV lines — appear frequently in the severity ranking because they serve local load pockets with limited alternative paths, so a single outage or a hot afternoon can push them to their limit. Higher-voltage 230 kV and 500 kV constraints bind less often but move much more power when they do.

Method and limitations

Rankings are built from CAISO OASIS market results (PRC_NOMOGRAM for internal constraints, PRC_CNSTR for interties), collected automatically and refreshed on this page weekly. They reflect what has been observed since tracking began — a 8-day window, not CAISO's full history, so a constraint that was severe last winter will not appear until it binds again. Internal and intertie counts come from feeds with different retention windows and should be compared within a section, not across them. Constraint names are parsed from CAISO's identifiers, so substation abbreviations follow CAISO's conventions. This page is informational only and is not trading, financial, or operational advice.