Most congested transmission constraints in CAISO

Congestion in the California ISO market shows up as a shadow price on a specific piece of equipment — a transmission line, a transformer, or an operating nomogram. This page ranks those constraints two ways: how often each one binds, and how hard it hits when it does. The two lists are not the same, and the difference is usually the interesting part.

327 constraints tracked · 109 day observation window · data through 2026-11-07

Binds most often — internal grid

Ranked by the number of market intervals in which each constraint was binding.
1EL CAJON – LOSCOCHS 69.0 kV (ckt 1)Line · 69 kV · peak $384.34370
2CLER LKE – KONOCTI6 60.0 kV (ckt 1)Line · 60 kV · peak $1040.27312
3DS AMIGO – PANOCHE 230 kV (ckt 1)Line · 230 kV · peak $1143.39309
4INYOKN nomogramNomogram · peak $-972.90294
5HGHLNDJ2 – CORTINA 115 kV (ckt 1)Line · 115 kV · peak $109.68287
6NEWARK D – NORTHERN 115 kV (ckt 1)Line · 115 kV · peak $1591.28252
7TAFT – Q356TAP 70.0 kV (ckt 1)Line · 70 kV · peak $111.92236
8TL23040 IV SPS nomogramNomogram · peak $-272.49235
9KINGSBRG – CONTADNA 115 kV (ckt 1)Line · 115 kV · peak $2359.56221
10SylmarBNK N-S Import nomogramNomogram · peak $-245.26219
11LE GRAND – ADRA TAP 115 kV (ckt 1)Line · 115 kV · peak $687.59204
12MELNS JA – AVENATP1 115 kV (ckt 1)Line · 115 kV · peak $198.95203
13KETTLEMN – GATES 70.0 kV (ckt 1)Line · 70 kV · peak $200.22202
14BRNSWKT1 – DTCH2TAP 115 kV (ckt 1)Line · 115 kV · peak $2368.33189
15HPLND JT – CLVRDLJT 60.0 kV (ckt 1)Line · 60 kV · peak $332.23184
Counts are binding intervals observed by Voltlas within the retained history window, across both day-ahead and real-time markets.

Highest shadow price reached — internal grid

Ranked by the largest shadow price observed, in dollars per megawatt-hour.
1OMS_21156170_SCE_PSPS_EXPNomogram · 6 binding intervals$-9446.51
2COLWATER – DUNNSIDE 115 kV (ckt 1)Line · 115 kV · 9 binding intervals$9236.67
3SANYSDRO – OTAY TP 69.0 kV (ckt 1)Line · 69 kV · 8 binding intervals$4688.88
4OTAY – OTAYLKTP 69.0 kV (ckt 1)Line · 69 kV · 13 binding intervals$36.45
5PENDLETN – SANLUSRY 69.0 kV (ckt 1)Line · 69 kV · 26 binding intervals$42.42
6WESTPARK – KERN PWR 115 kV (ckt 1)Line · 115 kV · 6 binding intervals$281.80
7HPLND JT – CLVRDLJT 60.0 kV (ckt 1)Line · 60 kV · 184 binding intervals$332.23
8INYOKN nomogramNomogram · 294 binding intervals$-972.90
9SC21ATP – ARVIN 70.0 kV (ckt 1)Line · 70 kV · 51 binding intervals$910.78
10BORDER – OL649 69.0 kV (ckt 1)Line · 69 kV · 2 binding intervals$53.51
11AEC_TP1 – TESLA 115 kV (ckt 1)Line · 115 kV · 75 binding intervals$1433.55
12SN JSE A – SNJOSEB 115 kV (ckt 1)Line · 115 kV · 99 binding intervals$773.17
13BRNSWKT1 – DTCH2TAP 115 kV (ckt 1)Line · 115 kV · 189 binding intervals$2368.33
14KINGSBRG – CONTADNA 115 kV (ckt 1)Line · 115 kV · 221 binding intervals$2359.56
15GARFIELD – EL CAJON 69.0 kV (ckt 1)Line · 69 kV · 1 binding intervals$80.66
Values are shown with the sign CAISO publishes; ranking uses magnitude. A single severe hour can outrank a constraint that binds far more often.

Interties — binds most often

Scheduling constraints on the paths connecting CAISO to neighbouring grids.
1LDWP_IPP_NORTHIntertie · peak $-64.78547
2IPPDCADLN_ITCIntertie · peak $-1000.00533
3PACW_CRAG_ITCIntertie · peak $-1000.00369
4IPPUTAH_ITCIntertie · peak $-1000.00272
5PACW_COI_IMPORT_ITCIntertie · peak $-47.65234
6SUNZIA_ITCIntertie · peak $-221.09189
7MALIN500_ISLIntertie · peak $-1000.00186
8MONAIPPDC_ITCIntertie · peak $-22.40164
9PACW_COI_EXPORT_ITCIntertie · peak $-3.27130
10PGE_PACW.PGE_ITC_IMPIntertie · peak $-1.04107
Intertie and internal counts are not directly comparable — the two feeds retain different history windows.

How to read these rankings

Frequency and severity measure different risks. A constraint that binds in most hours at a few dollars per megawatt-hour is a chronic, predictable feature of the network — it shapes where power is worth producing, but rarely surprises anyone. A constraint that binds twice a month at $9447 per megawatt-hour is the opposite: mostly invisible, then briefly dominant. Traders, schedulers, and planners tend to care about different ends of that spectrum.

Voltage is a useful second signal. Lower-voltage elements — 60, 69, 70, and 115 kV lines — appear frequently in the severity ranking because they serve local load pockets with limited alternative paths, so a single outage or a hot afternoon can push them to their limit. Higher-voltage 230 kV and 500 kV constraints bind less often but move much more power when they do.

Method and limitations

Rankings are built from CAISO OASIS market results (PRC_NOMOGRAM for internal constraints, PRC_CNSTR for interties), collected automatically and refreshed on this page weekly. They reflect what has been observed since tracking began — a 109-day window, not CAISO's full history, so a constraint that was severe last winter will not appear until it binds again. Internal and intertie counts come from feeds with different retention windows and should be compared within a section, not across them. Constraint names are parsed from CAISO's identifiers, so substation abbreviations follow CAISO's conventions. This page is informational only and is not trading, financial, or operational advice.

← Live congestion monitorAll tracked constraints →